摘要 |
PROBLEM TO BE SOLVED: To provide a build-up method of a foundation pile for easily and quickly building up even a long size pile, a work machine for building up the foundation pile, and an attachment for building up the foundation pile. SOLUTION: This build-up attachment M is rotatably installed in the longitudinal direction in a tip part of an arm of the work machine S. The build-up attachment M is provided with a wire 81 with a base connected to a wire 80 capable of hoisting. The wire 81 with the base is hooked on an outer peripheral surface of a wooden pile K, and the wooden pile K is fastened by hoisting force of the wire 80, and is fixed to a side surface 21 of the build-up attachment M. The wooden pile K is built up in the ground by lowering the arm 90 in its fixed state. COPYRIGHT: (C)2006,JPO&NCIPI
|