摘要 |
PROBLEM TO BE SOLVED: To facilitate the infilling work of a mold, which is performed as part of the greening of a slope. SOLUTION: This infilling method for the mold is practiced for the greening of the slope (10) where the mold (12) is installed. The infilling method comprises a step of installing a partition plate assembly (16), supported by the mold, in the square (14) of the mold (12), and of infilling a space, partitioned by the partition plate assembly, with a filler (18). The filler can be composed of a mixture including soil and wood. COPYRIGHT: (C)2006,JPO&NCIPI
|