摘要 |
PURPOSE:To automatically perform the preparation, change and addition of a production plan with satisfying various constraint conditions by seeking for an idle machine caused in the prepared production plan with satisfying the constraint in production and providing the means adding a new plan to the production plan. CONSTITUTION:A production system model is input to a device 1 by constructing and editting on an information display device 10 by an information input device 11 and a production plan is prepared by performing the situlation of the produc tion system by using a device 4 according to the model of this device 1. The production plan is then assessed by an assessment device 5 and in case of chang ing it, the editing of the production plan by an editing device 6. Also in case of adding work to the production plan, an idle machine is sought for by a seeking device 7, the allocation of the work adding to the idle time of a machine by a adding device 8 is then performed and a device 4 is used in case of performing the re-simulation further. |