摘要 |
PROBLEM TO BE SOLVED: To provide a method and a system for materializing real-time comparison with using an alternative control system on a turbine. SOLUTION: This method may include a phase 510 for modeling a turbine 10 by a primary adaptation turbine model 310 including at least one primary operation parameter 330, and a phase 530 for modeling the turbine by an alternative adaptation turbine model 320 including at least one alternative operation parameter 360. This method may also include a phase 525 for determining a first output value at least partially corresponding to operation of the turbine based on a primary control system from the primary adaptation turbine model, and a phase for adjusting one or plurality of alternative operation parameters based on an alternative control system and at least partially based on a first output value. Moreover, this method may include a phase 575 for determining comparison data at least partially based comparison between the primary control system and the alternative control system. COPYRIGHT: (C)2009,JPO&INPIT
|