摘要 |
PROBLEM TO BE SOLVED: To surely and rapidly migrate configuration data before and after a replacement, and reduce a load of a replacement work. SOLUTION: When a meter is replaced, a process is initiated by mutually connecting the meter (A) to be replaced and the meter (B) to be used after the replacement. If a predetermined input operation is accepted (S1), the meter (B) finishes the process without accepting an operation input unless it is in a shipment mode, and if in the shipment mode, it generates a request signal to the meter (A) (S3), and transmits the request signal to the meter (A) (S4). The meter (A) generates a response signal including predetermined data stored in its storage means (S5), and transmits the response signal to the meter (B) (S6). The meter (B) copies data included in the response signal to its storage means 12 (S7). COPYRIGHT: (C)2009,JPO&INPIT
|