发明名称 METHOD FOR TRENCHLESS INSTALLATION OF TRAYS UNDER MOTOR AND RAIL ROADS IN CONSTRUCTION OF MAIN PIPELINES
摘要 FIELD: technological processes. ^ SUBSTANCE: invention is related to construction of pipeline transport and is used in installation of pipelines under motor and rail roads. Receiving and working foundation pit is prepared, guide frame is laid on bottom of working foundation pit, pipe is placed on the latter, and its diametre is 10-30 times less than diametre of pipeline tray. Preliminarily low diametre guide channel is manufactured by piercing of cord along axis of specified location of tray, low-capacity linear explosive substance (ES) is placed in it, exploded, then pipe with conic tip that is 2-31 times less than tray diametre is inserted into prepared guide channel of low diametre. Ground piercing is done with welding of pipe segments until tip exits into receiving foundation pit, low diametre pipe is withdrawn, and linear ES is pulled through produced well. On the road, above area of tray installation, energy-reflecting or energy-absorbing screens are laid, or their combination, and extended ES charge is exploded, and tray is entered into produced channel. ^ EFFECT: simplifies and accelerates pipeline installation under road. ^ 4 cl; 3 dwg
申请公布号 RU2362080(C1) 申请公布日期 2009.07.20
申请号 RU20070142595 申请日期 2007.11.19
申请人 OOO "GAZPROM TRANSGAZ SAMARA" 发明人 STEPANENKO OLEG ALEKSANDROVICH;IOFFE BORIS VLADIMIROVICH;LAPIN ANDREJ EVGEN'EVICH;SMOLJAKOV BORIS VLADIMIROVICH
分类号 F16L1/028 主分类号 F16L1/028
代理机构 代理人
主权项
地址