摘要 |
PROBLEM TO BE SOLVED: To easily and surely perform a mounting operation for those parts around a defroster duct and an air conditioner duct, and also well perform the shaping of the defroster duct and the air conditioner duct. SOLUTION: The air conditioner duct 33 comprises a duct nozzle 41 connected to a second blowing ports 37-39 side and a connection duct 42 connected to the duct nozzle 41 and an air conditioner unit 31 side. An engagement part 51 engaged with the defroster duct 32 on the air conditioner unit 31 side is formed on the connection duct 42. Fall prevention members 46-49 fitted into the duct nozzle 41 for preventing the connection duct 42 from coming out of the duct nozzle 41 are fitted to the connection duct. COPYRIGHT: (C)2009,JPO&INPIT
|