发明名称 PRODUCTION SCHEDULE PREPARATION METHOD AND SYSTEM THEREFOR
摘要 <p><P>PROBLEM TO BE SOLVED: To prepare a high-quality schedule for a production line including a process for lot sizing by preparing a schedule for respective processes and an overall schedule. <P>SOLUTION: This production schedule preparation method has: process schedulers 11-14 each preparing a process schedule of its own process; and an overall scheduler 20 preparing an overall schedule from the respective schedules. The process scheduler has: a process schedule preparation part 112 preparing the schedule of the own process from a restriction condition; and a process cost simulation part 114 calculating cost information of the prepared process schedule. The overall scheduler has: an overall schedule preparation part 201 preparing the overall schedule from the respective process schedules; an overall cost simulation part 202 calculating cost information related to work procedure efficiency of the prepared overall schedule; and a correction processing part (207, 111) creating a new restriction condition for correcting the respective process schedules from the cost information. <P>COPYRIGHT: (C)2009,JPO&INPIT</p>
申请公布号 JP2009075631(A) 申请公布日期 2009.04.09
申请号 JP20070241213 申请日期 2007.09.18
申请人 KOBE STEEL LTD 发明人 IMOTO KOSUKE;UMEDA TOYOHIRO
分类号 G05B19/418;G06Q50/00;G06Q50/04 主分类号 G05B19/418
代理机构 代理人
主权项
地址