发明名称 |
PRODUCTION SCHEDULE PREPARATION METHOD AND SYSTEM THEREFOR |
摘要 |
<p><P>PROBLEM TO BE SOLVED: To prepare a high-quality schedule for a production line including a process for lot sizing by preparing a schedule for respective processes and an overall schedule. <P>SOLUTION: This production schedule preparation method has: process schedulers 11-14 each preparing a process schedule of its own process; and an overall scheduler 20 preparing an overall schedule from the respective schedules. The process scheduler has: a process schedule preparation part 112 preparing the schedule of the own process from a restriction condition; and a process cost simulation part 114 calculating cost information of the prepared process schedule. The overall scheduler has: an overall schedule preparation part 201 preparing the overall schedule from the respective process schedules; an overall cost simulation part 202 calculating cost information related to work procedure efficiency of the prepared overall schedule; and a correction processing part (207, 111) creating a new restriction condition for correcting the respective process schedules from the cost information. <P>COPYRIGHT: (C)2009,JPO&INPIT</p> |
申请公布号 |
JP2009075631(A) |
申请公布日期 |
2009.04.09 |
申请号 |
JP20070241213 |
申请日期 |
2007.09.18 |
申请人 |
KOBE STEEL LTD |
发明人 |
IMOTO KOSUKE;UMEDA TOYOHIRO |
分类号 |
G05B19/418;G06Q50/00;G06Q50/04 |
主分类号 |
G05B19/418 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|