摘要 |
PURPOSE: A water way structure on a steep slope is provided to prevent mortar placed between precast left and right walls which are located at the bottom of a steep slope from becoming deformed. CONSTITUTION: A water way structure on a steep slope comprises precast left and right walls(10), connecting socket units(11), lifting hooks(12), cut planes(13), reinforcing bars(14), and a wire net(15). The connecting socket units are integrated in one end of the left and right walls to connect the left and right walls to each other. The lifting hooks are integrally formed in the top ends of the left and right walls. The cut planes are formed on the inner sides of the bottom of the left and right walls and touch concrete placed on slopes. The reinforcing bars connect the left and right walls and are integrated in the bottoms of the left and right walls. The wire net is connected to the reinforcing bars and is integrated in the bottoms of the left and right walls. |