A combined cycle power generating plant that can realize a reduction in the start-up time includes a gas turbine, a steam turbine, a steam supplying section that supplies steam to the gas turbine, a first steam pipe that directs steam from the steam supplying section to the gas turbine, a second steam pipe that directs steam from the gas turbine to the steam turbine, a first release section that carries out control such that the supply destination of steam that is directed to the first steam pipe is one of either the outside of the gas turbine or the outside of the first steam pipe, a second release section that carries out control such that the supply destination of steam that is directed to the second steam pipe is one of either the outside of the steam turbine or the outside of the second steam pipe, and a bypass pipe that directs at least a portion of the steam inside the first steam pipe to the second steam pipe between the gas turbine and the second steam pipe. |