发明名称 METHOD FOR DIGGING TUNNEL
摘要 PURPOSE: A tunnel excavation method for the construction of closely spaced parallel tunnels is provided to implement a tunnel with structural safety without cutting the soil from the original ground and to minimize the damages for the original ground. CONSTITUTION: A tunnel excavation method for the construction of closely spaced parallel tunnels is composed of the following steps of: a step of installing multiple reinforcements(20) for the upper part of a tunnel and a pillar part reinforcement(25) on the upper part of a pillar part formed in between the upper parts of tunnels and tunnels in the direction of the tunnels; a step of installing a gate on the starting point of the tunnel; a step of excavating a leading tunnel(1a) at a constant depth along a planned excavation line; a step of installing a pillar part support beam(40) to be penetrated into the intended following tunnel(1b); a step of installing a tunnel support beam(50a) on the excavated surface of the leading tunnel and of connecting the tunnel support to the pillar part support; a step of excavating the following tunnel with the depth corresponding to the depth of the leading tunnel; and a step of installing the tunnel support beam and of connecting the tunnel support with the pillar part support beam extended from the leading tunnel.
申请公布号 KR101244257(B1) 申请公布日期 2013.03.18
申请号 KR20120128960 申请日期 2012.11.14
申请人 SUNGWOO SLOPE REINFORCEMENT COMPLETION CO., LTD.;JEONG, JAE HOON;LEE, PYOUNG WOO 发明人 LEE, PYOUNG WOO;JEONG, JAE HOON
分类号 E21D9/00;E21D11/00;E21D11/18 主分类号 E21D9/00
代理机构 代理人
主权项
地址