摘要 |
<p>PROBLEM TO BE SOLVED: To provide a column-beam joint structure, a frame structure, and a method of joining a column and a beam that replace construction of post-cast concrete for joining girders to each other with respect to columns and beams of a reinforced-concrete building using pre-cast concrete members.SOLUTION: A column-beam joint structure includes: a column member 12 made of pre-cast concrete having reinforcing bars 18 projecting downward from a lower surface; a column-beam joint member 14 which has a through hole 22 penetrating the inside vertically and reinforcing bars 24 projecting from side end faces to the right and left, and is made of pre-cast concrete; and a beam member 16 which has insertion holes 26 extending inward from both right and left end faces respectively in right-left directions, and is made of pre-cast concrete. The reinforcing bars 24 of the colum-beam joint members 14 are inserted and arranged in the insertion holes 26 on both sides of the beam members 16, and reinforcing bars 18 of the column members 12 are inserted and arranged in the through holes 22 of the colum-beam joint members 14.</p> |