发明名称 原子力設備の施工用準備ユニット、原子力設備の施工システム
摘要 A nuclear power plant construction preparation unit includes: a device main body (30) which enters into a space; a moving part which causes the device main body (30) to enter into the space; an eddy-current inspection sensor (31) which is provided on the device main body (30), and which detects a target portion of a member surface within the space; a punch marking part (32) which is provided on the device main body (30), and which performs marking on the member surface; and a control part which controls the moving part and the marking device (32) based on detection results from the target portion detection device (31), to thereby perform marking at a relative position with respect to the target portion.
申请公布号 JP5781314(B2) 申请公布日期 2015.09.16
申请号 JP20110004740 申请日期 2011.01.13
申请人 三菱重工業株式会社 发明人 関 伊佐夫;渡邊 久展;井 裕一;松浦 貴之
分类号 G21C19/02;B21D22/02;B23K9/00;B23K31/00 主分类号 G21C19/02
代理机构 代理人
主权项
地址