摘要 |
The present invention relates to a deck load using a self-propelled pile and a construction method thereof. According to the present invention, a deck load comprises: a screw pile wherein a spiral protrusion is installed in a lower portion and an excavation unit is provided in a lower end, embedded in the ground by a rotational force; a basement core formed by concrete, wherein at least a portion is embedded in the ground, and fixing a gap between an upper structure and a lower structure of the screw pile; a support reinforcing member coupled to an upper portion of the screw pile, and extended in a left and a right side of the screw pile; and an upper structure installed in an upper surface of the support reinforcing member. According to the present invention, the deck load is easily constructed, thereby shortening a construction period and minimizing destruction of the environment in a construction process. |