发明名称 CONSTRUCTION MANAGEMENT SYSTEM
摘要 A method for managing a construction project, wherein the method includes, in one or more electronic processing devices: for a selected standard construction design, retrieving a construction model for the standard construction design from a store, the construction model including a plurality of material elements representing materials for use in carrying out a construction project in accordance with the construction model, each material element having material properties including construction attributes; determining one or more design customisations; updating the construction model in accordance with the one or more design customisations to thereby generate a customised construction model, by at least one of adding one or more material elements, removing one or more material elements, and modifying one or more material elements; and generating construction information associated with carrying out the construction project in accordance with the construction attributes of the customised construction model.
申请公布号 US2015234377(A1) 申请公布日期 2015.08.20
申请号 US201514624367 申请日期 2015.02.17
申请人 ResiWeb Limited 发明人 Mizikovsky Lev
分类号 G05B19/4097;G06F17/50 主分类号 G05B19/4097
代理机构 代理人
主权项 1) A method for managing a construction project, wherein the method includes, in one or more electronic processing devices: a) for a selected standard construction design, retrieving a construction model for the standard construction design from a store, the construction model including a plurality of material elements representing materials for use in carrying out a construction project in accordance with the construction model, each material element having material properties including construction attributes; b) determining one or more design customisations; c) updating the construction model in accordance with the one or more design customisations to thereby generate a customised construction model, by at least one of: i) adding one or more material elements;ii) removing one or more material elements; and,iii) modifying one or more material elements; and, d) generating construction information associated with carrying out the construction project in accordance with the construction attributes of the customised construction model.
地址 Rocklea AU