发明名称 |
CONSTRUCTION MANAGEMENT SYSTEM |
摘要 |
A method for managing a construction project, wherein the method includes, in one or more electronic processing devices: for a selected standard construction design, retrieving a construction model for the standard construction design from a store, the construction model including a plurality of material elements representing materials for use in carrying out a construction project in accordance with the construction model, each material element having material properties including construction attributes; determining one or more design customisations; updating the construction model in accordance with the one or more design customisations to thereby generate a customised construction model, by at least one of adding one or more material elements, removing one or more material elements, and modifying one or more material elements; and generating construction information associated with carrying out the construction project in accordance with the construction attributes of the customised construction model. |
申请公布号 |
US2015234377(A1) |
申请公布日期 |
2015.08.20 |
申请号 |
US201514624367 |
申请日期 |
2015.02.17 |
申请人 |
ResiWeb Limited |
发明人 |
Mizikovsky Lev |
分类号 |
G05B19/4097;G06F17/50 |
主分类号 |
G05B19/4097 |
代理机构 |
|
代理人 |
|
主权项 |
1) A method for managing a construction project, wherein the method includes, in one or more electronic processing devices:
a) for a selected standard construction design, retrieving a construction model for the standard construction design from a store, the construction model including a plurality of material elements representing materials for use in carrying out a construction project in accordance with the construction model, each material element having material properties including construction attributes; b) determining one or more design customisations; c) updating the construction model in accordance with the one or more design customisations to thereby generate a customised construction model, by at least one of:
i) adding one or more material elements;ii) removing one or more material elements; and,iii) modifying one or more material elements; and, d) generating construction information associated with carrying out the construction project in accordance with the construction attributes of the customised construction model. |
地址 |
Rocklea AU |