摘要 |
<p>Disclosed are systems and methods of producing from multiple production zones with a single trip multi-zone completion system. One single trip multi-zone completion system includes an outer completion string having at least one sand screen arranged thereabout and an interval control valve coupled to the at least one sand screen, a production tubing communicably coupled to the outer completion string at a crossover coupling, a control line extending external to the production tubing and being communicably coupled to the crossover coupling, and a surveillance line extending from the crossover coupling external to the outer completion string and interposing the at least one formation zone and the at least one sand screen, the surveillance line being communicably coupled to the interval control valve.</p> |