摘要 |
PROBLEM TO BE SOLVED: To securely prevent interference with an edge of a cut, equipment, piping, etc., on the premise that a rear transverse beam is provided with the cut.SOLUTION: A wire arrangement structure of a construction machine in which pipes 13 etc., led out of a cabin are run backward to a wire arrangement space A formed between a cabin deck and a floor plate 11 is provided with a cut 26 in an upper-surface rear part of a rear transverse beam 22 constituting the cabin deck and a wire arrangement plate 27 tilted down backward in the cut 26, and the pipes 13 etc., are fixed with a fixing band 31 while tilted down backward along the wire arrangement plate 27. |