摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a construction method of a steel pipe support capable of being easily implemented and installing the steel pipe support at a precise position (in terms of vertical and horizontal directions). <P>SOLUTION: A construction method of a steel pipe support 100 includes the processes: to erect a steel pipe pile 1 in the ground 900 (S1); to fill the steel pipe pile 1 with soil 2 (S2); to place slab concrete 3 so that an upper surface 31 thereof is constructed at a predetermined vertical position A (S3); to install a steel pipe support 4 on the upper surface 31 of the slab concrete 3 (S4); to insert wedges 5 into a gap between an upper edge 11 of the steel pipe pile 1 and a side wall of the steel pipe support 4 so that the steel pipe support 4 can be installed at a predetermined horizontal position (S5); to place surrounding concrete 6 between the steel pipe pile 1 and the steel pipe support 4 (S6); and to place encasing concrete 7 (S7). <P>COPYRIGHT: (C)2012,JPO&INPIT</p> |