发明名称 METHOD FOR DEVELOPMENT OF DOME OIL FORMATION AT LAST OPERATIONAL STAGE
摘要 FIELD: oil and gas industry.SUBSTANCE: in the method for development of dome oil formation at last operational stage extraction of the product is made through producers and working fluid is injected through injectors. Local area of the deposit is selected according to difference of hypsometric depths between the producer and injector per 3 m and more. In the producer standard downhole pumping equipment is replaced by downhole pumping equipment operable on round-the-clock basis. When change in water cut per 10-15% is detected volume of extracted product is limited due to change in operation time of round-the-clock downhole pumping equipment. At that at the injector area injection is limited or the well is shut in completely. Periodic measurements are made for water cut changes in operation mode of the producer. When water cut is reduced operation is continued in elastic drive without start-up of the influencing injector. Periodic measurements of water cut and bottomhole pressure are repeated for the producer. When bottomhole pressure is reduced per 5% and more in regard to the initial measured value the injector operation is started and change in the main parameters of water cut and bottomhole pressure is controlled in the producers.EFFECT: higher oil recovery of the deposit.1 ex
申请公布号 RU2557284(C1) 申请公布日期 2015.07.20
申请号 RU20140140934 申请日期 2014.10.10
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IM. V.D. SHASHINA 发明人 KHISAMOV RAIS SALIKHOVICH;TAZIEV MIRGAZIJAN ZAKIEVICH;GANIEV BULAT GALIEVICH;TUKTAROV TAGIR ASGATOVICH
分类号 E21B43/20 主分类号 E21B43/20
代理机构 代理人
主权项
地址