发明名称 |
TIME SYNCRONIZATION BETWEEN BATTERY CONTROLLER MODULES FOR PARAMETER MEASUREMENTS |
摘要 |
A multi-cell battery pack in an electric vehicle is monitored by multiple sensing modules. A primary controller is coupled to a first plurality of cells to measure a predetermined parameter of each cell. The primary controller determines a sampling moment recurring at a fixed frequency for sampling the predetermined parameter of each of the first plurality of cells. The primary controller generates a sync pulse at each sample moment. A secondary controller is coupled to a second plurality of cells to measure the predetermined parameter of each cell. The secondary controller receives the sync pulse to start a pulse generator operating at a frequency which is a predetermined multiple of the primary controller fixed frequency. The secondary controller counts pulses generated by the pulse generator and schedules a synchronized secondary sampling moment according to a predetermined pulse count. |
申请公布号 |
US2015198672(A1) |
申请公布日期 |
2015.07.16 |
申请号 |
US201414156569 |
申请日期 |
2014.01.16 |
申请人 |
FORD GLOBAL TECHNOLOGIES, LLC |
发明人 |
Tabatowski-Bush Ben A.;Keramidas Ai |
分类号 |
G01R31/36 |
主分类号 |
G01R31/36 |
代理机构 |
|
代理人 |
|
主权项 |
1. Apparatus for an electric vehicle having at least one multi-cell battery pack, comprising:
a primary controller coupled to a first plurality of cells to measure a predetermined parameter of each cell, the primary controller determining a sampling moment recurring at a fixed frequency for sampling the predetermined parameter of each of the first plurality of cells, wherein the primary controller generates a sync pulse at each sample moment; a secondary controller coupled to a second plurality of cells to measure the predetermined parameter of each cell, the secondary controller receiving the sync pulse to start a pulse generator operating at a frequency which is a predetermined multiple of the primary controller fixed frequency, the secondary controller counting pulses generated by the pulse generator and scheduling a secondary sampling moment according to a predetermined pulse count. |
地址 |
DEARBORN MI US |