发明名称 CHANGE CONVERGENCE RISK PLANNING AND AVOIDANCE
摘要 Disclosed is a change convergence risk mitigation system. The change convergence risk mitigation system typically includes a processor, a memory, and a risk mitigation module stored in the memory. The change convergence risk mitigation system is typically configured for: receiving information associated with a plurality of events; determining an event risk score for each of the plurality of events; aggregating the event risk scores of the plurality of events and, based on the event risk scores, determining a risk level for each of the plurality of time periods; identifying a risk mitigation event; determining a risk mitigation time period from the plurality of time periods such that the risk mitigation time period would not have a predefined level if the risk mitigation event occurred during the risk mitigation time period; and providing a recommendation that the risk mitigation event occur during the risk mitigation time period.
申请公布号 US2015199511(A1) 申请公布日期 2015.07.16
申请号 US201414152634 申请日期 2014.01.10
申请人 BANK OF AMERICA CORPORATION 发明人 Faile, JR. James W.;Micek James J.;Cummings Roxanna L.;Petersen Jodi L.
分类号 G06F21/55 主分类号 G06F21/55
代理机构 代理人
主权项 1. A change convergence risk mitigation system, comprising: a processor; a memory; a risk mitigation module stored in the memory, executable by the processor and configured for: receiving information associated with a plurality of events occurring during a plurality of time periods, wherein the information associated with each event includes event timing information and event risk information;determining an event risk score for each of the plurality of events;aggregating the event risk scores of the plurality of events and, based on the event risk scores, determining a risk level for each of the plurality of time periods;identifying a risk mitigation event;based on an event risk score of the risk mitigation event, determining a risk mitigation time period from the plurality of time periods such that the risk mitigation time period would not have a predefined level if the risk mitigation event occurred during the risk mitigation time period; andproviding a recommendation that the risk mitigation event occur during the risk mitigation time period.
地址 Charlotte NC US