发明名称 |
CHANGE CONVERGENCE RISK PLANNING AND AVOIDANCE |
摘要 |
Disclosed is a change convergence risk mitigation system. The change convergence risk mitigation system typically includes a processor, a memory, and a risk mitigation module stored in the memory. The change convergence risk mitigation system is typically configured for: receiving information associated with a plurality of events; determining an event risk score for each of the plurality of events; aggregating the event risk scores of the plurality of events and, based on the event risk scores, determining a risk level for each of the plurality of time periods; identifying a risk mitigation event; determining a risk mitigation time period from the plurality of time periods such that the risk mitigation time period would not have a predefined level if the risk mitigation event occurred during the risk mitigation time period; and providing a recommendation that the risk mitigation event occur during the risk mitigation time period. |
申请公布号 |
US2015199511(A1) |
申请公布日期 |
2015.07.16 |
申请号 |
US201414152634 |
申请日期 |
2014.01.10 |
申请人 |
BANK OF AMERICA CORPORATION |
发明人 |
Faile, JR. James W.;Micek James J.;Cummings Roxanna L.;Petersen Jodi L. |
分类号 |
G06F21/55 |
主分类号 |
G06F21/55 |
代理机构 |
|
代理人 |
|
主权项 |
1. A change convergence risk mitigation system, comprising:
a processor; a memory; a risk mitigation module stored in the memory, executable by the processor and configured for:
receiving information associated with a plurality of events occurring during a plurality of time periods, wherein the information associated with each event includes event timing information and event risk information;determining an event risk score for each of the plurality of events;aggregating the event risk scores of the plurality of events and, based on the event risk scores, determining a risk level for each of the plurality of time periods;identifying a risk mitigation event;based on an event risk score of the risk mitigation event, determining a risk mitigation time period from the plurality of time periods such that the risk mitigation time period would not have a predefined level if the risk mitigation event occurred during the risk mitigation time period; andproviding a recommendation that the risk mitigation event occur during the risk mitigation time period. |
地址 |
Charlotte NC US |