摘要 |
PROBLEM TO BE SOLVED: To provide an operation plan preparation device capable of preparing an operation plan that can reduce energy consumed in the entire operation sections.SOLUTION: An operation plan preparation device 100 includes an operation plan preparation part 11 including operation plan condition setting means 12, operation curve condition setting means 13, operation curve preparation means, and operation plan preparation means 15. The operation curve preparation means acquires a first operation curve and a first consumption energy in each inter-station section, corrects a travel time between stop stations on the basis of a total extension time when the total extension time is set, and acquires a second operation curve on the basis of the corrected travel time. The operation plan preparation means prepares an operation plan using the second operation curve. |