发明名称 BACKFILL SCHEDULING FOR EMBARRASSINGLY PARALLEL JOBS
摘要 Backfill scheduling for embarrassingly parallel jobs. A disclosed method includes: receiving an initial schedule having a plurality of jobs scheduled over time on a plurality of nodes, determining that a first job can be split into a plurality of sub-tasks that can respectively be performed in parallel on different nodes, splitting the first job into the plurality of sub-tasks, and moving a first sub-task from its position in the initial schedule to a new position to yield a first revised schedule.
申请公布号 US2015178126(A1) 申请公布日期 2015.06.25
申请号 US201414309283 申请日期 2014.06.19
申请人 International Business Machines Corporation 发明人 Modani Manish;Prabhakar Giridhar M.;Sure Ravindra R.
分类号 G06F9/48 主分类号 G06F9/48
代理机构 代理人
主权项 1. A method comprising: receiving an initial schedule of jobs, including a plurality of jobs, scheduled over time on a plurality of nodes; determining that a first job from the plurality of jobs can be split into a plurality of sub-tasks that can respectively be performed in parallel on different nodes; splitting the first job into the plurality of sub-tasks; and moving a first sub-task from its position in the initial schedule to a new position to yield a first revised schedule.
地址 Armonk NY US