发明名称 |
REINFORCEMENT MATERIAL AND DEVELOPMENT METHOD THEREOF |
摘要 |
PROBLEM TO BE SOLVED: To provide a method of developing a reinforcement material, configured to increase bearing resistance against removal by reliably injecting an injection material around reinforcement materials, in reinforcing relatively small-scale slope ground against landslide. ! SOLUTION: A reinforcement material development method includes the steps of: arranging a filling pipe 40 in a hole 111 filled with an injection material; arranging filling packers 50-52 in the filling pipe 40; pressure-supplying the injection material through the injection packers 50-52, and discharging the injection material into a ground 100 through one discharge hole 47 of the filling pipe 40; moving the injection packers 50-52 along a longitudinal direction, pressure-injecting the injection material through the injection packers 50-52, and discharging the injection material into the ground through the other discharge holes 47 of the filling pipe 40; and removing the injection packers 50-52 and filling the filling pipe |
申请公布号 |
JP2015110893(A) |
申请公布日期 |
2015.06.18 |
申请号 |
JP20140211656 |
申请日期 |
2014.10.16 |
申请人 |
RAITO KOGYO CO LTD ; RAILWAY TECHNICAL RESEARCH INSTITUTE ; INTEGRATED GEOTECHNOLOGY INSTITUTE LTD |
发明人 |
TATEYAMA MASARU ; NAKAJIMA SUSUMU ; YOKOTA KOICHI ; TAKAHASHI TOKU ; BEPPU MASAAKI ; OKAMOTO MASAHIRO ; TAMURA YUKIHIKO |
分类号 |
E02D5/80;E02D3/12;E02D17/20 |
主分类号 |
E02D5/80 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|