摘要 |
A suspended scaffolding 10 includes a frame 20 obtained by temporarily assembling columns 22 and supports 40, wherein the frame 20 is carried in from a ceiling side of a small room in which a floor surface and wall surfaces have been formed. The columns 22 are disposed at positions approximately overlapping with ceiling beams in a plan view of the small room and are partially removed after construction of a ceiling. The supports 40 are connected to the columns, wherein each support 40 is adjustably attached to a ceiling beam, adjustable in a horizontal direction relative to the ceiling beam. An installation operation scaffolding 30 is attached to the frame 20 at a height position which allows equipment to be carried in at the floor surface side of the small room. An installation method using suspended scaffolding comprising a ceiling construction scaffold, a wall finishing scaffold and an equipment installation scaffold is also disclosed. The suspended scaffolding eliminates the need to repeatedly remove and erect installation scaffolding. |