发明名称 |
SIMULATION SYSTEM OF PRODUCTION WELL TUBING |
摘要 |
<p>According to the present invention, as pressure decompression gradient generated when gas produced in a coal bed is transferred from a bottom hole to a well head is realized, a simulation system to accurately carry out gas production analysis in a laboratory scale can be provided. The amount of producing gas can be analyzed, and simultaneously, a series of a process transporting the produced gas to a final consumption place can be analyzed in a laboratory scale. As the time of operating or installing a compressor or a pump can be grasped, a collection rate in accordance with producing gas can be increased. A specification of a compressor or a pump can be selected corresponding to the amount of producing gas which is aimed in an actual collection system, and the time of operating or installing a compressor or a pump can be grasped, thereby reducing waste of power in accordance with the operation of a compressor or a pump.</p> |
申请公布号 |
KR101527959(B1) |
申请公布日期 |
2015.06.16 |
申请号 |
KR20140001225 |
申请日期 |
2014.01.06 |
申请人 |
IUCF-HYU (INDUSTRY-UNIVERSITY COOPERATION FOUNDATION HANYANG UNIVERSITY) |
发明人 |
SUNG, WON MO;KIM, KI HONG;SEOMOON, HYEOK;BAEK, SOO HYUN |
分类号 |
E21B47/10;E21B43/12;E21B47/06 |
主分类号 |
E21B47/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|