发明名称 MATERIAL DISTRIBUTING CONTROL METHOD FOR MATERIAL DISTRIBUTING APPARATUS AND THE MATERIAL DISTRIBUTING APPARATUS
摘要 A material distributing boom of a material distributing apparatus comprises at least two boom sections. A material distributing control method comprises: first, controlling the first boom section to move to a vertical state, and keeping the first boom section in the vertical state; second, controlling other boom sections to move to accomplish material distributing work. A material distributing apparatus implements the material distributing control method. On the premise of ensuring maximum material distributing height, the material distributing control method provided achieves reduced supporting spans of the legs of the material distributing apparatus in material distributing work and provides possibility for reducing the strength of the legs by sacrificing the material distributing radius to some degree innovatively. The material distributing control method is helpful for reducing the dimensions of the telescopic legs and reducing reinforcing parts, and thereby effectively attains the purpose of weight reduction and effectively ensures stability and safety.
申请公布号 US2015160659(A1) 申请公布日期 2015.06.11
申请号 US201214239754 申请日期 2012.12.07
申请人 ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY CO.,LTD. 发明人 Huang Ke;Wu Bin Xing;Guo Gang;Kuang Hao;Wu De Zhi
分类号 G05D7/06;G05B15/02 主分类号 G05D7/06
代理机构 代理人
主权项 1. A material distributing control method for material distributing apparatus, the material distributing boom of the material distributing apparatus comprises at least two boom sections that are hinged in sequence and can fold and stretch in respect to each other; wherein, the material distributing control method comprises: firstly, controlling the first boom section of the material distributing boom to move to a vertical state, and keeping the first boom section in the vertical state; secondly, controlling the other boom sections of the material distributing boom to move to accomplish material distributing work, and keeping the first boom section always in the vertical state in the entire material distributing process.
地址 Changsha, Hunan CN