发明名称 METHOD FOR SLOPE REINFORCEMENT CONSTRUCTION USING THE GROUND IMPROVEMENT PRODUCT
摘要 <p>The present invention does not need an additional facility to block a road or to reinforce a slope during construction as the slope is restored and/or reinforced by paving ground improvement products using a top down method after excavation in the slope, and can restore and reinforce the slope to an environment matched with a peripheral nature environment as a structure is not exposed by restoring the slope using an in-ground type. The present invention comprises: a top down section setting step of partitioning a collapsed or scoured slope to be worked into one or more sections; a construction step of successively constructing from an upper section to a lower section among the sections set in the top down section setting step, and constructing a retaining wall by deciding a start spot and an end spot of the excavation so as to be closed with a gutter and a drainage close to the working slope, forming an excavation groove recessed from the ground in the selected section, and filling the excavation groove with a ground improvement product mixture; and a planting step of planting plants on the surface of the retaining wall after the construction step.</p>
申请公布号 KR101525942(B1) 申请公布日期 2015.06.10
申请号 KR20150032691 申请日期 2015.03.09
申请人 E-GEO;PARK, HEUNG SOO;PARK, SO MIN 发明人 PARK, HEUNG SOO;PARK, SO MIN
分类号 E02D29/02 主分类号 E02D29/02
代理机构 代理人
主权项
地址
您可能感兴趣的专利