摘要 |
PROBLEM TO BE SOLVED: To realize significant cost down in a method which can be performed more quickly, at a lower cost, and more easily, without affected by weather, with a construction period shortened by excluding drying period, and being possible to be performed even with an unskilled worker. ! SOLUTION: A mortar sill installation tool includes a mortar sill 1, a hanging nut 2, a hanging bolt 3, a height adjustment nut 4, and a hanging metal bar 5. The hanging nut 2 is embedded in an upper part of the mortar sill 1. The hanging bolt 3 is screwed into the hanging nut 4 for fitting. Into the hanging bolt 3, the hanging metal bar 5 is screwed for hanging from a template frame. Further, from above, the height adjustment nut 4 is screwed, and the height at which the mortar sill 1 is installed is adjusted by the hanging nut 2. ! COPYRIGHT: (C)2015,JPO&INPIT |