发明名称 トンネル覆工コンクリートの養生方法
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a method of curing tunnel lining concrete capable of easily constructing, and capable of supplying a concrete placing surface with additional water even after the construction to cure the tunnel lining concrete placed at the worksite of tunnel construction. <P>SOLUTION: The placement of tunnel lining concrete along the length of a tunnel contains repeating a procedure comprising the steps of setting an arch center, placing the tunnel lining concrete, and removing and shifting the arch center. A bubble sheet composed of layered back films 4 for encapsulating air into projections 2 is spread over a cap film 3 with the plurality of hollow projections 2 swelling out so that the side with projections 2 faces the concrete placing surface 10 after removing the arch center, and is supported with a holder 11 constructed in the shape of an arch along the inner wall of the tunnel, and the space between the bubble sheet 1 and the concrete placing surface 10 is placed under a negative pressure into intimate contact with each other. <P>COPYRIGHT: (C)2012,JPO&INPIT</p>
申请公布号 JP5727306(B2) 申请公布日期 2015.06.03
申请号 JP20110135691 申请日期 2011.06.17
申请人 发明人
分类号 E21D11/10 主分类号 E21D11/10
代理机构 代理人
主权项
地址