发明名称 SYSTEMS AND METHODS FOR PROBABILITY BASED RISK PREDICTION
摘要 Systems and methods for probability based prediction of risks are disclosed herein. In one embodiment, a method includes measuring, using sensing elements individually associated with multiple users, a first set of data associated with the users. The method also includes transmitting to and storing in a computing device the measured first set of data and applying a performance model to the first set of data to generate a first set of performance values. The method further includes estimating a second set of data associated with the one or more users and applying the performance model to the second set of data to generate a second set of performance values. The method yet further includes determining if the first and second sets of performance values are statistically equivalent to each other.
申请公布号 US2015148616(A1) 申请公布日期 2015.05.28
申请号 US201414554891 申请日期 2014.11.26
申请人 Washington State University ;FedEx Corporation 发明人 Van Dongen Hans P.A.;Rangan Suresh;Lewis Richard A.
分类号 A61B5/00;A61B5/18 主分类号 A61B5/00
代理机构 代理人
主权项 1. A method, comprising: measuring, using sensing elements individually associated with multiple users, a first set of sleep data associated with the users operating according to a first duty schedule, the sleep data containing at least one or more of sleep starting time, sleep ending time, or time of day during sleep corresponding to each user; transmitting to and storing in a computing device the measured first set of sleep data; with the computing device, applying, a fatigue model to the first set of sleep data to generate a first set of fatigue values;estimating a second set of sleep data associated with the users according to a second duty schedule different than the first duty schedule without subjecting the individuals to perform duties according to the second duty schedule;applying the fatigue model to the second set of sleep data to generate a second set of fatigue values; anddetermining if the second duty schedule is equivalent to the first duty schedule based on the generated first and second sets of fatigue values.
地址 Pullman WA US