发明名称 Method of subsurface modelling
摘要 Disclosed is a method of modelling a subsurface volume. History data for one or more parameters over a first period of time is obtained. The first period of time comprises a plurality of schedule periods, each schedule period having associated with it a sampled value of the considered parameter at the corresponding time. A merge error value is attributed to plural pairs of consecutive schedule periods, the merge error value representing a magnitude of the error in a merged value of each parameter over the duration corresponding to a pair of schedule periods being considered, relative to the sampled values for said pair of schedule periods being considered. The pair of schedule periods which have the smallest error value attributed thereto is merged, and the merged schedule period has attributed to it, the corresponding merged value of the corresponding parameter. The error value calculation and merger steps are repeated so as to reduce the total number of schedule periods. The method allows finely discretised muti-well, multii parameter history to be upscaled into a coarser support of information, but while still preserving the frequency content of simulated pressure.
申请公布号 GB2520558(A) 申请公布日期 2015.05.27
申请号 GB20130020815 申请日期 2013.11.26
申请人 TOTAL E&P UK LTD 发明人 PIERRE BERGEY
分类号 G01V99/00;E21B43/00 主分类号 G01V99/00
代理机构 代理人
主权项
地址