发明名称 A CONTROLLING METHOD OF A GENERATOR SET PROVIDED WITH A BYPASS SYSTEM
摘要 The present invention discloses a bypass control method, comprising: during the starting period of a generating unit provided with a bypass system, the boiler (1) is firstly started; the bypass system comprises a first-side bypass valve group (6,7) and a second-side bypass valve group (8,9)–¡closing the second-side bypass valve group (8,9) and at the same time widely opening the first-side bypass valve group (6,7), so that the steam through a outlet header (5) is discharged only from the first-side bypass valve group (6,7); after maintaining the first-side bypass valve group (6,7) open for a required time period, closing the first-side bypass valve group (6,7) and at the same time opening the second-side bypass valve group (8,9), so that the steam from the header (5) is discharged only from the second-side bypass valve group (8,9); after maintaining the second-side bypass valve group (8,9) open for a required time period, restoring the normal control and being prepared for impulse starting of a turbine (10). The erosion rate of the solid particles is reduced and the safety of the generating unit is improved by controlling the bypass system.
申请公布号 EP2175105(A4) 申请公布日期 2015.05.20
申请号 EP20070845794 申请日期 2007.12.03
申请人 SHANGHAI WAIGAOQIAO NO.3 POWER GENERATION CO.LTD 发明人 FENG, WEIZHONG
分类号 F01D19/00;F01D15/10;F01K7/22;F01K13/02;F22B37/22;F22B37/52 主分类号 F01D19/00
代理机构 代理人
主权项
地址