摘要 |
<p><P>PROBLEM TO BE SOLVED: To perform working by which the cost of a die is reduced, a working time is shortened and a space is saved. <P>SOLUTION: In either of one upper die 3 and one lower die 2 which are opposed, in one stroke of the upper die, a pair of straight and parallel metal lead wires 13 are positioned by a positioning member 14; an separating punch 30 is forced in between the pair of the metal lead wires; the pair of the lead wires are separated outward; the portions separated outward of the pair of the metal lead wires are bent by being pressed inward with a pair of driving members 15 which are driven with pushing pins 34 by taking the separating punch as supporting points; the portions which are bent inward of the pair of the lead wires are arranged in block parts 32; and the portions which are bent inward toward block parts 32 are crashed by second block parts 23. A hole is bored in the crashed parts of the pair of the metal lead wires by a die hole and the punching punch which are provided on either of the block parts and the second block part which are opposed and the driving means for driving vertically the punching punch. <P>COPYRIGHT: (C)2013,JPO&INPIT</p> |