发明名称 |
Connector device |
摘要 |
A connector device is provided in which a fitting force acts on a female connector and a male connector by operating a lever from a fitting start operation position to a fitting end operation position. The connector device includes a semi-fitting detection portion and a pressing portion. The semi-fitting detection portion is located at a non-projecting position below a peripheral surface of a frame of the female connector and is shifted to a projecting position to project from the peripheral surface of the frame by a pressing force. The pressing portion is provided in the male connector, presses and shifts the semi-fitting detection portion to the projecting position when located at a fitting halfway position before a fitting end position, and stops pressing the semi-fitting detection portion when located at the fitting end position so as to shift the semi-fitting detection portion to the non-projecting position. |
申请公布号 |
US9028266(B2) |
申请公布日期 |
2015.05.12 |
申请号 |
US201314141566 |
申请日期 |
2013.12.27 |
申请人 |
Yazaki Corporation |
发明人 |
Shimizu Tomohiko;Tashiro Akinori;Tsuruta Akihiro;Terao Kazuya |
分类号 |
H01R13/64;H01R13/74;H01R13/516;H01R13/629 |
主分类号 |
H01R13/64 |
代理机构 |
Mots Law, PLLC |
代理人 |
Motsenbocker Marvin A.;Mots Law, PLLC |
主权项 |
1. A connector device comprising:
a first connector including a first connector housing provided with a first terminal therein, a frame fixed to the first connector housing and provided with a connector fitting guide portion, and a lever rotatably supported by the frame; a second connector including a second connector housing provided with a second terminal therein, the second connector housing being guided by the connector fitting guide portion so as to be fitted to the first connector,
wherein a fitting force acts on the first connector and the second connector by operating the lever from a fitting start operation position to a fitting end operation position, the second connector moves from a fitting start position to a fitting end position, and the frame is inserted and mounted to a mounting hole of a mounting member in a state where the first connector and the second connector are fitted together; a semi-fitting detection portion which is located at a non-projecting position below a peripheral surface of the frame of the first connector and is shifted to a projecting position to project from the peripheral surface of the frame by a pressing force; and a semi-fitting operation portion which is provided in the second connector, presses and shifts the semi-fitting detection portion to the projecting position when located at a fitting halfway position before the fitting end position, and stops pressing the semi-fitting detection portion when located at the fitting end position so as to shift the semi-fitting detection portion to the non-projecting position. |
地址 |
Tokyo JP |