发明名称 |
CONSTRUCTION MACHINE HYDRAULIC DRIVE SYSTEM |
摘要 |
PROBLEM TO BE SOLVED: To provide a construction machine hydraulic drive system for correcting a malfunction if a boom lifting operation and a revolving operation are performed simultaneously.SOLUTION: A construction machine hydraulic drive system 1A includes: a first hydraulic pump 11 and a second hydraulic pump 12 tilt angles of which can be independently regulated; a revolving control valve 51 for controlling supply of a working fluid to a revolving motor 19; and a boom main-control valve 41 and a boom sub-control valve 42 for controlling supply of the working fluid to a boom cylinder 13. The revolving control valve 51 and the boom sub-control valve 42 are arranged on a first bleed line 21 whereas the boom main-control valve 41 is arranged on a second bleed line 31. A revolving operation valve 50 outputs a pilot pressure to the revolving control valve 51, and a boom operation valve 40 outputs a pilot pressure to the boom main-control valve 41. If a revolving operation and a boom lifting operation are simultaneously performed, a boom restriction valve 7 restricts the pilot pressure from being output to the boom sub-control valve 42. |
申请公布号 |
JP2015086959(A) |
申请公布日期 |
2015.05.07 |
申请号 |
JP20130226451 |
申请日期 |
2013.10.31 |
申请人 |
KAWASAKI HEAVY IND LTD |
发明人 |
KONDO TETSUHIRO;ITO MAKOTO;FUJIYAMA KAZUTO |
分类号 |
F15B11/02;E02F9/22;F15B11/17 |
主分类号 |
F15B11/02 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|