发明名称 METHOD TO FIX SLOPES OF MOTOR ROAD EMBANKMENT
摘要 FIELD: construction.SUBSTANCE: onto an earth strip directly adjacent to embankment foot, with width of 2.5-3.0 meters, fertile soil is moved in one-two trips of a grader from a strip located at the distance of 4.0-7.0 meters from the slope foot, to produce a layer of 15-20 cm. Then earth is ploughed up with full layer turnover for depth of 50 cm. At the same time it is tilled, and fertile layer is moved to the depth of 20-50 cm, and layer of low-fertility soil reaches the surface, further preventing intense development of weed plants. Then, using a tree planter, low-growing or trailing creeping-rooted shrubs are planted into the prepared soil, and its roots, getting during planting into fertile soil, which is periodically wetted with precipitation flowing off the road bed, develop intensively and produce root shoots, which populate the entire embankment slop to its border.EFFECT: increased efficiency of motor road embankment slopes fixation due to soil strengthening with durable and strong branched roots of shrubs.
申请公布号 RU2549637(C1) 申请公布日期 2015.04.27
申请号 RU20140112639 申请日期 2014.04.01
申请人 FEDERAL'NOE GOSUDARSTVENNOE BJUDZHETNOE OBRAZOVATEL'NOE UCHREZHDENIE VYSSHEGO PROFESSIONAL'NOGO OBRAZOVANIJA "VOLGOGRADSKIJ GOSUDARSTVENNYJ ARKHITEKTURNO-STROITEL'NYJ UNIVERSITET" (VOLGGASU) 发明人 ANOPIN VLADIMIR NIKOLAEVICH;RULEV GLEB ALEKSANDROVICH
分类号 E02D17/20 主分类号 E02D17/20
代理机构 代理人
主权项
地址