摘要 |
<p>PROBLEM TO BE SOLVED: To provide a landfill method which enables efficient landfilling.SOLUTION: Between filling layers 10a of landfill soil 11 standing out in a shape of about trapezoid, an about hexagon filling layer 10b whose upper part stands out in a shape of about trapezoid from the height position of the top face of the filling layer 10a is constructed with the landfill soil 11. Then, between upper parts 10b' of the filling layers 10b standing out in a shape of about trapezoid from the top faces of the filling layer 10a, the about hexagon filling layer 10b is constructed. This is repeated subsequently, and landfill is progressed to the upside. The filling layers 10a and 10b are constructed while covered with small roof bodies 5, and as the filling layers 10a and 10b are constructed in an appointed direction on a plane, the roof bodies 5 are moved in the appointed direction.</p> |