摘要 |
In one example, an integrated well survey management and planning tool is implemented by a computer system. The tool can receive survey data describing a well being drilled from a surface to a subterranean geological target to be reached by drilling the well. The well is associated with a target trajectory on which the well is to be drilled from the surface to the subterranean geological target. Based, at least in part, on the survey data and the target trajectory, the tool determines an uncertainty indicator indicating an uncertainty in drilling the well on the target trajectory, and displays the uncertainty indicator in a user interface. |