摘要 |
PROBLEM TO BE SOLVED: To provide a facility load selection device and a facility load selection method capable of appropriately dealing with an overcurrent at recovery after interruption of power supply.SOLUTION: At recovery after interruption of power supply, a load of buildings is selected and blocked according to an estimation result of an overcurrent. In this way, the overcurrent to an accumulator battery at the recovery after interruption of power supply is estimated, and a load of factories and buildings is selected in consideration of its result. Specifically, in a system having power generation facilities by a recyclable energy, the accumulator battery, and power distribution to the factories and buildings, and performing power control for factories, a facility group estimating a rush current to distributed power supply facilities at recovery of a plant in consideration of a rush current value by a general load such as a fluorescent lamp and of a load activation timing, and blocking the load, is planned. |