摘要 |
During measuring an insulation resistance for an inverter having at least one half-bridge including two active switching elements for driving an output current, and a DC link voltage, a center point of the half-bridge positioned between the switching elements is connected to a grounding point by closing a grounding switch, and the center point connected to the grounding point is connected, one after the other, to a first ungrounded terminal and a second ungrounded terminal of the DC link voltage of the inverter present at the half-bridge by means of the two active switching elements of the half-bridge to establish a connection between the first and second ungrounded terminals, respectively, and the grounding point. A current flowing via the connection to the grounding point is measured using a measuring device. |