摘要 |
The present invention relates to a sediment control dam including a grouting filling part and a grouting method for the same. The sediment control dam including a grouting filling part comprises: an embankment main body (10) built by banking gravel, sand, and soil on the foundation ground (30) to store water in one side; a core barrier wall (20) which is made of viscous mud materials and of which the cross section is shaped into a trapezoid with a narrow top and a wide bottom to be installed at the internal center of the embankment main body (10); a plurality of grouting injection parts (40) installed in an injection hole (41) bored at a predetermined distance from the core barrier wall (20); and a grouting filling part (50) injected into a filling hole (51) bored through a space between the plurality of grouting injection parts (40) to fill up a destroyed part of the embankment main body (10). Therefore, the sediment control dam including a grouting filling part cuts off running water leaking from an embankment by carrying out leakage prevention and reinforcement for the embankment, which can cause the collapse of the embankment, thereby preventing the embankment from being weakened and collapsed. |