发明名称 斜面補強工法における最初の段のプレキャスト板の設置工法
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a slope face reinforcing construction using an inverted lining method, in which a precast plate installed in a preceding step does not subside due to excavation in a following step. <P>SOLUTION: A slope face reinforcing construction method includes the following steps of: excavating and forming a step part 11 on which a precast plate body 1 is mounted; driving a reinforcement pile 12 into the step part 11; installing the precast plate body 1 on the step part 11; drilling a natural ground M through a through hole 5 of each precast plate body 1; attaching a washer 16 to a rod-like reinforcement material 15 inserted into a drilled part 14 and screwing and fastening the rod-like reinforcement material 15 by a nut 17; injecting a grout material into the drilled part 14 to form a support pile body 18; and injecting a backfill material into a clearance 13 between a rear face of the precast plate and the mounting surface 11a. <P>COPYRIGHT: (C)2013,JPO&INPIT</p>
申请公布号 JP5698604(B2) 申请公布日期 2015.04.08
申请号 JP20110120429 申请日期 2011.05.30
申请人 发明人
分类号 E02D17/18;E02D17/20;E02D29/02 主分类号 E02D17/18
代理机构 代理人
主权项
地址