发明名称 |
RAPID RELEASE EMERGENCY DISCONNECT SYSTEM UTILIZING A LINEAR CLAMPING MECHANISM |
摘要 |
In various embodiments, fluid conduits such as high pressure hoses deployed in-between two sea-fairing vessels may be released during an emergency by using a rapid release emergency disconnect system as described herein, where the rapid release emergency disconnect system may engage with a hanger such as an industry standard frac hanger and be used in-line with fluid conduits such as high-pressure lines. Various skid embodiments are described which can be configured to interface with one or more of the described rapid release emergency disconnect systems. |
申请公布号 |
US2015090338(A1) |
申请公布日期 |
2015.04.02 |
申请号 |
US201414496308 |
申请日期 |
2014.09.25 |
申请人 |
OCEANEERING INTERNATIONAL, INC. |
发明人 |
Spexarth Gary R.;Myers Richard Allan;Gebhardt Kyle William;Carter Jordan Ashley |
分类号 |
F16L37/407;F16L37/23;F16L37/62 |
主分类号 |
F16L37/407 |
代理机构 |
|
代理人 |
|
主权项 |
1. An emergency quick disconnect system, comprising:
a. a connector comprising a first fluid interface and a second fluid interface in fluid communication with the first fluid interface; and b. a drop away assembly, comprising:
i. a hub and clamp interface, comprising:
1. a first hub;2. a second hub; and3. a hub clamp disposed intermediate the first hub and the second hub;ii. a valve connected to the hub and clamp interface and disposed upstream from and in fluid communication with the connector, the valve comprising a third fluid interface and a fourth fluid interface in fluid communication with the third fluid interface, the valve configured to stop flow of a fluid between the third fluid interface and the fourth fluid interface;iii. the connector interface configured to be removably accepted into a hanger and support the connector and valve when the connector interface is received into the hanger, the connector interface further comprising:
1.a clamp comprising a first clamp section, a second clamp section, the clamp configured to selectively compress seal against the connector;2. a retraction pin configured to engage the hub and clamp interface; and3. an actuator configured to selectively (i) compress and seal the clamp against the connector and (ii) decompress and release the clamp seal. |
地址 |
Houston TX US |