发明名称 SYSTEMS AND METHODS TO REINFORCE EXCAVATION WALLS
摘要 A soldier pile wall for shoring an excavation site includes a plurality of drilled shafts drilled along an edge of the excavation site, a plurality of soldier piles, each of the plurality of soldier piles being positioned within a respective drilled shaft, and a pre-stressing system coupled to at least some of the plurality of soldier piles. The pre-stressing system is configured to induce stresses to counteract working stresses of the soldier pile wall. Related methods are also provided.
申请公布号 WO2015048175(A1) 申请公布日期 2015.04.02
申请号 WO2014US57284 申请日期 2014.09.24
申请人 POST TENSIONING SOLUTIONS LLC 发明人 LUCIA, JOSEPH, MARINO;THOMPSON, RICK, ALLEN
分类号 E02D5/18;E02D17/04 主分类号 E02D5/18
代理机构 代理人
主权项
地址