发明名称 二重殻タンクの建設方法
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a construction method of a double shell tank in which inspection work of a roof is made efficient while prolongation of a manufacturing period is suppressed. <P>SOLUTION: Without waiting for an inspection of an inner tank roof to complete in the whole area, while an inspection is being made in a second area of the inner tank roof, an outer tank roof is formed in an area covering a first area of the inner tank roof of which inspection has completed earlier. <P>COPYRIGHT: (C)2013,JPO&INPIT</p>
申请公布号 JP5691805(B2) 申请公布日期 2015.04.01
申请号 JP20110102069 申请日期 2011.04.28
申请人 发明人
分类号 E04H7/06;B65D88/06;E04H7/18 主分类号 E04H7/06