发明名称 トンネル鋼板内張改修工事の特殊インバート工法及びそのための特殊インバート材
摘要 <p><P>PROBLEM TO BE SOLVED: To perform welding successively also on an installation range including a sump when successively welding steel plates along the axial direction and joining them within a tunnel in a tunnel steel plate lining repair construction. <P>SOLUTION: According to a special invert method for a tunnel steel plate lining repair construction, a sump which collects inflow water is provided on a bottom part in the middle of a tunnel 10 in the axial direction and while draining water from the sump, steel plates of an invert material to be joined to a bottom side within the tunnel 10 and a crown material 40 to be joined to a top side are joined by successively welding a circumferential abutment end portion and an axial abutment end portion, thereby repairing the tunnel 10. In an installation range including the sump, a special invert material 30 is joined. With the special invert material 30, a drainage pit 32 is formed which includes an opening 34 which is formed through a bottom surface part at a position corresponding to the sump, and an opening/closing manhole 36 which is disposed lower than the opening 34. <P>COPYRIGHT: (C)2013,JPO&INPIT</p>
申请公布号 JP5691991(B2) 申请公布日期 2015.04.01
申请号 JP20110227283 申请日期 2011.10.14
申请人 发明人
分类号 E21D11/15;E21D11/38;E21F16/02 主分类号 E21D11/15
代理机构 代理人
主权项
地址