摘要 |
<p>PROBLEM TO BE SOLVED: To achieve the function of absorbing a construction error of a lower vertical pile.SOLUTION: A construction method includes the steps of: driving a hollow lower vertical pile; inserting a joint member into a hollow part of the lower vertical pile and a regular position of a horizontal plane where the joint member is to be positioned; filling a space between the lower vertical pile and the joint member with a filler for fixing both relative positions; and providing an upper vertical column above the joint member.</p> |