发明名称 |
SYSTEMS AND METHODS TO REINFORCE EXCAVATION WALLS |
摘要 |
A soldier pile wall for shoring an excavation site includes a plurality of drilled shafts drilled along an edge of the excavation site, a plurality of soldier piles, each of the plurality of soldier piles being positioned within a respective drilled shaft, and a pre-stressing system coupled to at least some of the plurality of soldier piles. The pre-stressing system is configured to induce stresses to counteract working stresses of the soldier pile wall. Related methods are also provided. |
申请公布号 |
US2015086278(A1) |
申请公布日期 |
2015.03.26 |
申请号 |
US201414495600 |
申请日期 |
2014.09.24 |
申请人 |
Post Tensioning Solutions LLC |
发明人 |
Lucia Joseph Marino;Thompson Rick Allen |
分类号 |
E02D17/20 |
主分类号 |
E02D17/20 |
代理机构 |
|
代理人 |
|
主权项 |
1. A soldier pile wall for shoring an excavation site, the soldier pile wall comprising:
a plurality of drilled shafts drilled along an edge of the excavation site; a plurality of soldier piles, each of the plurality of soldier piles being positioned within a respective drilled shaft; and a pre-stressing system coupled to at least some of the plurality of soldier piles, the pre-stressing system configured to induce stresses to counteract working stresses of the soldier pile wall. |
地址 |
Kent WA US |