发明名称 Multi-alloy vertical semi-continuous casting method
摘要 The invention relates to a method for the vertical semi-continuous direct chill casting of composite billets or plates comprising at least two layers of aluminum alloys, using a separator which is in contact with the solidification front and which provides a seal between the two alloys during casting, said separator being vibrated while it is in contact with the solidification front, so that the separator is not frozen in and entrained by the solid metal. The invention also relates to a device that can be used to carry out said method.
申请公布号 US8985190(B2) 申请公布日期 2015.03.24
申请号 US201214131421 申请日期 2012.07.10
申请人 Constellium France 发明人 Jarry Philippe;Guy Serge
分类号 B22D11/04;B22D11/14;B22D11/00 主分类号 B22D11/04
代理机构 Miles and Stockbridge 代理人 Miles and Stockbridge
主权项 1. A semi-continuous vertical direct chill casting process for manufacturing a rolling slab and/or extrusion billet, in which a separator and two liquid metal supply systems, optionally spouts or troughs or tundishes, arranged on either side of the separator, are used, and wherein said process comprises: a) One aluminium alloy is cast through a first liquid metal supply system, optionally a spout or trough or tundish, into a semi-continuous vertical casting mould, b) The separator, made of metal and/or a refractory material, is introduced into the mould, in contact with the solidification front, c) A second aluminium alloy is cast into the semi-continuous vertical casting mould, on the other side of the separator, via a second liquid metal supply system, optionally a spout or trough or tundish, d) The separator is raised simultaneously with the end of casting of the alloys, or before the end of casting of the alloys, in which case, the alloys may mix together in a zone in which slab and/or billet casting ended, e) The solidified slab and/or billet is removed from the semi-continuous casting mould, wherein a vibrator, and/or a vibratory motion is applied to the separator, at least while said separator is in contact with the solidification front, to prevent said separator from becoming trapped and/or entrained by solidified metal.
地址 Paris FR